The building was planned by Gary Edward Handel & Associates. Post-tensioning reinforcement of the structure was supplied and engineered by Suncoast Post-Tension. The building was constructed with dense steel reinforcing and silica-fumeconcrete, and is designed to sustain hurricane-force winds.