Furka Base Tunnel is a 15.4 km long
Swiss rail
tunnel that connects
Oberwald (at 1369 metres above
sea level) in the
Canton of Valais with
Realp (at 1538 m) in the
Canton of Uri. The base tunnel replaced the previous overland track that climbed to an apex of 2160 metres above sea level at the Furka stop below
Furka Pass (2431 m). The old line has partly been reopened by the
Furka Heritage Railway for touristic trains which pass the Furka Pass via the 1,8 km
Furka Summit Tunnel.
The base tunnel allows the Matterhorn-Gotthard train to provide year-round service to its entire network. Previously, the overland route closed during the winter months because of heavy snowfall and large sections of the overhead electrical lines had to be dismantled. In 1976, the
Parliament of Switzerland passed a bill for its construction, sponsored by
Roger Bonvin, following an initial cost estimate of 76 million
francs.
The construction costs quickly escalated due to the difficult geological conditions and, in the end, exceeded 300 million Francs. The political fighting surrounding the
cost overruns are said to have contributed to Roger Bonvin's ill health toward the end of the project and he died just before its opening in 1982.
In its initial year of operation, the base tunnel was used to transport more than 75,000 passenger cars, trucks and buses. Currently, it also serves both an hourly regional train and 10 daily