This article is about the proposed railway to Maroochydore, Queensland. For the existing Sunshine Coast Citytrain service, see Nambour and Gympie North railway line.
The 'Maroochydore railway line (or CAMCOS, Caloundra and Maroochydore Corridor Options Study), is a proposed single trackQRCitytrainrailway line due for construction and progressive completion in stages between 2015 and 2020. Initial public consultation was conducted in January 1999, with newsletters and displays of aerial photographs.
The North Coast Line is being realigned and upgraded with a second track between Caboolture and Landsborough stations to enable higher capacity for the line to accommodate Maroochydore trains, to improve the reliability of existing freight and commuter services, and reduce running times.
In July 2007 the City of Caloundra and Queensland Government commissioned a study into the realignment of the proposed corridor in Caloundra South. It is proposed the corridor be altered to run west of Golden Beach, and through the Caloundra Aerodrome site.