Tatipudi Reservoir Project was constructed across Gosthani River during 1963-1968. The Project is aimed to irrigate a total ayacut of in Vizianagaram District and to provide drinking water to Visakhapatnam City. The Project utilizes 3.325 TMC of the available water and the reservoir storage capacity is about 3 TMC. The Cost of the project is Rs. 1.820 crores. The Ayacut of has been stabilised in Gantyada, S.Kota and Jami Mandals of Vizianagaram District.
There is Andhra Pradesh Residential Junior College for Girls at Tatipudi.